WAKOLAdhesives and installation
WAKOL MS 262
A one-component, firm-elastic MS polymer adhesive: no mixing, no venting and around 40 minutes of open time.
Restoration · installation · parquet care
Send us the state of your floor, or find a proven LOBA + WAKOL system. From the substrate to the final coat, every step stays connected.
Denis Šol s.p. · projects in Slovenia
Every route connects the preparation, the right system and the checkpoints during the work.
Sanding, gap filling and a LOBA lacquer or oil.
open procedure →02new unfinished parquetWAKOL substrate and adhesive, LOBA finish.
open procedure →03engineered parquetFlatness, full-surface bonding and first care.
open procedure →04cleaning and careIdentifying the surface, the right cleaner and renewable care.
open guide →The whole room, the problem close up, m², location and anything you know.
The state of the wood, the substrate, any existing protection and the measurements needed.
A proposed procedure, a system, or the need for a site visit before work begins.
On your phone you swipe between related demonstrations and technical routes. The player connects to YouTube only when you tap it.
Open the products where they actually work within the system. No top layer corrects a misjudged substrate.
Every product has its own page with use, consumption, times, video and warnings.
WAKOLAdhesives and installation
A one-component, firm-elastic MS polymer adhesive: no mixing, no venting and around 40 minutes of open time.
LOBA2K lacquers
Extremely matt 2K protection with the look and feel of raw, almost untreated wood.
LOBACleaning lacquered floors
A pH-neutral concentrate for routine damp cleaning of water-resistant surfaces.
Yes. WAKOL covers substrate preparation and bonding; LOBA covers gap filling, colour, lacquer, oil, cleaning and maintenance.
A photo of the whole room, a close-up of the problem, the surface shot against the light, the approximate area, the location and anything you know about the substrate or the existing coating.
First we establish which information is already sufficient and which measurements or site visit are still missing. Then you get a sensible next step, not a random list of products.
With a permitted substrate, format and application method, the foil bag with its special triangular nozzle is a very direct route. Measuring the substrate, checking flatness and the parquet manufacturer's approval are still mandatory.
Lacquer forms a closed, resistant film; penetrating oil keeps a more direct feel and allows local repair; HardwaxOil is the film-forming oil-and-wax route.
No. A video shows the movement and the sequence. The current technical and safety data sheets define the permitted substrates, consumption, times and limits.
Because adhesive, primer and levelling compound cannot correct misdiagnosed moisture, a weak screed or a structural problem.
Last updated: